[SMM Analysis] Lion Rock Resources Discovers High-Grade Lithium Ore at Volney Project in South Dakota

Published: May 14, 2025 15:09
Lion Rock Resources recently announced that in the surface sampling program conducted at its Volney project in South Dakota, the assay results of lithium ore indicated that the lithium content in the ore pile samples reached up to 5.3% Li₂O, while the lithium content in the pegmatite outcrop samples reached 3.7% lithium oxide (Li₂O). These discoveries have extended the lithium-mineralized pegmatite trend to an area of 1,000 meters by 500 meters. The Volney project, located in the Black Hills mining district, 20 kilometers southwest of Spearfish, is a previously producing polymetallic project renowned for its high-grade gold, lithium, and tin ores.

Lion Rock Resources recently announced that in the surface sampling program conducted at its Volney project in South Dakota, lithium ore assay results revealed lithium contents of up to 5.3% Li₂O in ore pile samples and 3.7% lithium oxide (Li₂O) in pegmatite outcrop samples. These discoveries have extended the lithium-mineralized pegmatite trend to a 1000m × 500m area. The Volney project, located in the Black Hills mining district, 20 kilometers southwest of Spearfish, is a past-producing polymetallic project renowned for its high-grade gold, lithium, and tin deposits.

  • High-grade lithium-cesium-tantalum (LCT) pegmatites in outcrops – notable expansion potential: A total of 26 outcrop samples were collected, with lithium oxide (Li₂O) contents exceeding 1.0%, confirming the presence of multiple high-grade lithium-mineralized pegmatites within a 1000m × 500m area, with potential for expansion in all directions. Importantly, a newly collected outcrop sample, located 600 meters from the historically significant Wallini pegmatite, contained a lithium oxide (Li₂O) content as high as 3.7%, highlighting the vast potential for discovering high-grade lithium mineralization beyond known historical areas and emphasizing the opportunity for significant expansion of the mineralized zone.
  • Verification of historical high-grade ore: A total of 43 ore pile and beneficiation plant waste rock samples had lithium oxide (Li₂O) contents exceeding 1.0%, with a maximum of 5.3%. In the historically significant Wallini pit area, the average grade of 26 ore pile samples was 3.8% lithium oxide (Li₂O), confirming the high-grade lithium content reported in historical bulk sampling.
  • High-grade polymetallic potential, including high-grade gold and tin: In addition to lithium, a total of 13 ore pile and beneficiation plant waste rock samples had tin (Sn) contents exceeding 1.0%, indicating significant potential for associated mineral recovery in the area. The mine also contains high-grade gold mineralization, with historical grades of up to 8.0 grams per tonne (g/t) gold over orebody thicknesses of 43.0 meters, and 18.2 g/t gold over orebody thicknesses of 18.3 meters.
  • Private land – rapid advancement of permitting: The Volney project is situated on 142 hectares of private land, with surface and mineral rights, enabling the rapid implementation of drilling programs and expediting the permitting process from exploration to production stages.

 

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM‘s internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or to learn more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
14 hours ago
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
Read More
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
On January 28th, the construction of the 500-kilovolt power transmission and transformation project in Fengtai, Beijing officially started. This project is the first newly-built 500-kilovolt power grid project in Beijing during the 15th Five-Year Plan period. It will significantly enhance the resilience and power receiving capacity of the southern Beijing power grid and provide reliable power support for Beijing to continuously optimize the investment structure and vigorously develop high-end, precise, and cutting-edge industries. The 500-kilovolt power transmission and transformation project in Fengtai, Beijing is a key project of Beijing's power grid during the 15th Five-Year Plan period and one of the "3 100" key projects in Beijing this year. It is constructed and managed by the State
14 hours ago
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
15 hours ago
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
Read More
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
On February 1st, the 500-kilovolt AC system of the Hezhou Converter Station, the receiving-end station of the ±800-kilovolt UHV DC power transmission project from northern Shaanxi to Anhui, was officially put into operation after a 24-hour trial run.
15 hours ago
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
15 hours ago
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
Read More
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
On February 2nd, the 750-kilovolt power transmission and transformation project of the third passageway from northern Shaanxi to central Shaanxi was fully connected. The project starts from the 750-kilovolt Shuofang Substation in Shenmu City in the north and ends at the 750-kilovolt Bailuyuan Substation in Lantian County in the south. It has newly built a 1,271-kilometer line, passing through 18 counties (districts) in 4 cities including Yulin, Yan'an, Weinan and Xi'an.
15 hours ago